Truck days and boat days
Write down once what the work needs, and a land crew is never sent to a lift only the barge can pull. Plus the pieces that winter in your yard.
· 4 min read
Half of a dock company’s work can be done from shore. A roll-in dock on a gentle bank, a wheel-in lift at a sandy beach, sections stacked in the customer’s yard: a truck, a trailer and two people do it. The other half needs the water: the lift in eight feet, the island cabin, the crib dock only the crane barge can reach. A good office knows which is which from memory. The trouble starts on the day the memory is out sick.
Write down what the work needs, once
In LakeOps that knowledge lives in Equipment needed, and it sits at the level that actually decides it. The property decides for an island or a shallow bay. The piece decides for the 9,000-pound lift that only comes out with the crane. And now and then the visit decides: this spring the water is low enough that the work boat will do. The closest one that says anything wins, so the property’s answer covers everything there until a piece or a job says otherwise.
A need can also be an either-or, because most jobs have more than one right answer. The crane barge, or the work boat and the winch. Each way is a set of gear that all has to be there, and you can record up to four ways. Pieces that take more hands than usual record how many people they need, too.
The truck crew never gets a boat job
When you send a crew out from land, LakeOps leaves out every piece of work whose every way needs a boat. It is not shown and marked; it is absent, from the day’s pool, its day pack, its chart and its list. Nobody drives forty minutes to look at a lift they could never have pulled.
The interesting case is the property that is half of each: a dock the truck can do and a lift that needs the barge. LakeOps splits it. The land crew sees its own lines, does them, and its stop says its part is done and the rest is waiting for a boat day. The job stays open for the barge. Nobody has to remember that the Lindqvists are half done.
On the water nothing is hidden. A boat sees the whole property, with anything it is not equipped for marked, because knowing the crane job is waiting at the third dock is how tomorrow gets planned.
And the pieces that winter with you
The other half of the season’s logistics is where things go when they come out. Sections and lifts that winter in your own yard now get a place in words and a pin on the yard map, and the crew reads “Store at” on the removal and “Fetch from” on the install, in the day pack, with no signal. The office has The yard: every piece wintering with you, on one map, with its owner.
Equipment needed covers setting it up, and install and storage pins covers the yard.