Equipment needed: saying what a job takes

Last updated November 19, 2026

Every property, item and job has an Equipment needed panel where you tick the equipment types the work takes — several together, or one of several ways — and dispatch then tells you in a sentence which planned days can do it.

Some work can be done by whoever turns up. Some cannot: the island lift needs a boat, the bay is too shallow for the fork barge, the lift haul-out needs the barge to lift it and the truck to take it away. Equipment needed is where you say so, once, in your own equipment types.

Step by step

  1. Open the property, the item or the job
    Each has a panel called Equipment needed. It says in one sentence what has to be there: “Any equipment”, “Needs: Crane barge”, “Either: Fork barge, or Truck & trailer”.
  2. Choose Edit
    Your equipment types appear as boxes to tick, in the same panel. Nothing else on the page changes.
  3. Tick everything that has to be there together
    Fork barge and Truck & trailer both ticked means the work needs both on the same day.
  4. If something else would do instead, choose “+ or another way”
    A second set of boxes opens. Tick what the other way takes. Up to four ways.
  5. Save
    The sentence changes, and so does what every planned day says about that work.

What the panel says

The panel readsWhat it meansHow it was ticked
Any equipment Nothing special. Any crew can do it. Nothing ticked.
Needs: Crane barge Only a day with the crane barge can do it. This is how you say “too shallow for the fork barge”: you name the one that can. One box.
Needs: Fork barge + Truck & trailer Both, on the same day. A boat day alone and a truck day alone each say what they are missing. Two boxes in the same set.
Either: Fork barge, or Truck & trailer Either crew can do it. Send whichever is going that way. One box, then “+ or another way”, then the other box.
Either: Fork barge, or Crane barge Only a boat can do it — a high bank, an island. A truck crew is never given it. Two ways, both boats.

The boxes are your own list, under Settings → Equipment types. Make it as fine as you work: if the fork barge and the crane barge do different jobs, they are two types. LakeOps does not work anything out from depth or bank height. It goes by what you tick.

Where to set it

  • On the property when the place decides: an island, a shallow bay, a high bank. Everything there follows it.
  • On an item when that piece decides: the big lift. The panel then reads “Set for this item”. The other pieces still follow the property.
  • On a job when this one visit is different. On the job form, open Equipment needed (it reads “From the items · Change”); you can set the people needed there too. It applies to every piece on that job, and to that job only.

The closest one wins: the job, then the item, then the property. The panel always says where its answer came from: “From the property”, “Set for this item”, “Set for this job”, or on a job that says nothing, “From the items”. Reset removes what was set there, and the answer comes from further up again.

Worth knowing

You cannot set “nothing” on an item to cancel what the property needs. If one piece at a crane-only property can be done by anybody, set what it does need on the other pieces and leave the property at Any equipment.

What dispatch shows

A day can do a piece of work when the equipment going out covers one whole way. When it cannot, the day says so in a sentence, under the stop in its list and beside each planned day on the job:

  • “Can do everything”
  • “This day can’t do it — needs Crane barge”
  • “Can do 2 of 3 — Lift needs Crane barge”
  • “Not on a land day — needs a boat”

A job also says what nobody has planned for yet: “Lift is waiting for a day with Crane barge”.

Boat work never goes to a truck day

If every way a piece can be done includes a boat, a crew that works from land is never given it. It is not on their list, not on their phone and not on their chart. A crew on the water still sees work it lacks the gear for, with the reason, so they know the crane has to come back. A day set to work from both is given everything.

Which types count as boats is the type’s category: barge, crane barge and work boat.

One job, two crews

A dock a truck can pull and a lift only the crane can set, on one job: send the truck crew and they see the dock. When it is done their phone reads “Your part is done — the rest is waiting for a boat day”, and the job stays open. The boat crew sees both pieces. The job finishes, and bills, when the last piece is done, whoever did it. There is nothing to assign.

Still stuck? Ask us — or go back to the help center.

Put your own shoreline on the screen

Create the account yourself, import your customer list, drop a few pins, and you’re looking at your own water this afternoon. No sales call, no setup fee, and nothing charged until your first season generates work.

No card, no sales call, nothing to book — you're in within a minute. Send us a question if you'd rather ask a person first.