How much to charge for dock installation and removal
Most shops price a dock install off what the last guy charged. How to build a real number from your own minutes per section, lift and canopy.
· 8 min read
How this work actually runs — the season, the pricing, the handoffs, and the parts of it software has never handled well.
Most shops price a dock install off what the last guy charged. How to build a real number from your own minutes per section, lift and canopy.
· 8 min read
The ice took three weeks and Memorial Day did not move. Size the hole in boat-days, buy capacity where it is cheap, and tell customers early.
· 5 min read
Two weeks after ice-out the air says summer and the water is in the low 40s. What immersion does, and the PFD rule that cannot have exceptions.
· 5 min read
One tap at the landing puts the whole day on the phone. What is aboard when the signal goes, what waits for bars, and three habits that make it hold.
· 5 min read
The whole season end to end: what must be true before the first launch, the daily rhythm, recording work piece by piece, and billing as jobs finish.
· 9 min read
The April calls are not about the date — they are about silence. One March email that gives a window instead of a promise. Template included.
· 4 min read
Not by sign-up date and not by who calls most. The water decides, the bays batch the days, and the gear sorts the rest.
· 4 min read
March is the only month a breakdown costs a phone call instead of a lost crew-day. The checklist, ordered by how long each fix takes to arrive.
· 5 min read
Ice-out moves three weeks a year, wind closes a shoreline without notice, and half your customers ring the week they arrive. Running a season anyway.
· 7 min read
Ice-out, shore station, crib dock, drawdown, riparian rights — the vocabulary of dock and lift work, defined one term at a time.
· 9 min read
Spreadsheet, then a general field-service tool, then the spreadsheet again beside it. Why that keeps happening — and the question that settles it.
· 8 min read
Season setup is one afternoon: walk the rollover list, untick whoever canceled, press generate. The whole spring sits on a map before hiring starts.
· 5 min read